The overlooked secret of off-site fabrication
Off-site manufacture, pre-fabrication, modular construction, whatever it is called it has been heralded as a win:win:win solution for construction.
Through the provision of cost effective building elements and units, which require fewer deliveries to site and offers a better finish quality with less waste – what can possibly be said against the growth of this modern method of construction?
Over the last couple of years, KLH Sustainability has been asked to evaluate a variety of modular construction solutions, and although we largely agree with the rhetoric and have been able to prove significant benefits of modular construction over conventional concrete frame constructions, something isn’t adding up.
The benefits we have calculated for the modular construction of a complete building versus traditional concrete frame construction include:
- Over 45% reduction in material use.
- Over 50% reduction in waste generation. Over 40% reduction in HGV movements at the construction site.
For modular buildings, this magnitude of benefits does require the modular solution to be explored and implemented at the early stages of design so that the lightweighting of the superstructure can be translated into reduced foundations.
We have observed the improved finish quality and the quicker, safer site construction. We are also, of course very supportive of the potential creation of new jobs in construction away from the construction site, jobs that may appeal more to diverse engineers and workers who want more consistency in job location and working hours.
So where is the issue? Carbon.
In the assessments we have undertaken to date the carbon impact for the modular solution does not balance, even if the reduced site deliveries, reduced waste and reduced construction programme are taken into account.
We have calculated the additional carbon impact of modular construction of buildings to be around 20%, although for some individual building elements it may be over 100%.
So, where is all this carbon coming from?
We have found that there is significantly more structural support within modular units to cope with the stresses of transportation and lifting into position on site than is required for the structural stability of the building. This additional structural support is often integral to the units, and is fabricated from that carbon hungry material--steel.
There are some interesting solutions out there. One we observed in central London, took the form of a bespoke, reusable lifting frame for double height mansard thereby allowing the units themselves to be constructed without excess bracing.
Perhaps lightweight fibre reinforced plastic can provide some of the additional structural integrity required in pre-fabricated units? Or low-carbon timber solutions exist?
The carbon balance for modular construction may be found in the improved operational performance of modular buildings. Factory facilities should enable units to be constructed with better U-values and air-tightness and potentially reduce the energy performance gap of our buildings. However, until this is accurately assessed and quantified it is difficult to claim modular buildings can deliver a better life-cycle carbon than conventional construction techniques.
The carbon impact does not, and should not be a show-stopper for modular construction. However, it is an aspect that should not be forgotten by those developing modular construction solutions. At KLH we know that sustainability is about more than just carbon, but equally carbon is not a factor that can be ignored.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Shortage of high-quality data threatening the AI boom
And other fundamental issues highlighted by the Open Data Institute.
Data centres top the list of growth opportunities
In robust, yet heterogenous world BACS market.
Increased funding for BSR announced
Within plans for next generation of new towns.
New Towns Taskforce interim policy statement
With initial reactions to the 6 month policy update.
Heritage, industry and slavery
Interpretation must tell the story accurately.
PM announces Building safety and fire move to MHCLG
Following recommendations of the Grenfell Inquiry report.
Conserving the ruins of a great Elizabethan country house.
BSRIA European air conditioning market update 2024
Highs, lows and discrepancy rates in the annual demand.
50 years celebrating the ECA Apprenticeship Awards
As SMEs say the 10 years of the Apprenticeship Levy has failed them.
Nominations sought for CIOB awards
Celebrating construction excellence in Ireland and Northern Ireland.
EPC consultation in context: NCM, SAP, SBEM and HEM
One week to respond to the consultation on reforms to the Energy Performance of Buildings framework.
CIAT Celebrates 60 years of Architectural Technology
Find out more #CIAT60 social media takeover.
The BPF urges Chancellor for additional BSR resources
To remove barriers and bottlenecks which delay projects.
Flexibility over requirements to boost apprentice numbers
English, maths and minimumun duration requirements reduced for a 10,000 gain.
A long term view on European heating markets
BSRIA HVAC 2032 Study.
Humidity resilience strategies for home design
Frequency of extreme humidity events is increasing.
National Apprenticeship Week 2025
Skills for life : 10-16 February